Solar detach & reset with your new roof
Panels off, roof replaced, panels back on. One crew coordinating the schedule, a licensed electrical contractor handling the array, and one written quote for the whole job.
Solar panel removal and reinstall: off, roofed, back on
A roof with panels on it needs the panels off to be replaced properly. Here is what actually happens, in order, and who does each part.

Panels off the day before
A licensed electrical contractor disconnects and removes the array the day before the roof, so the crew has a clear deck at first light.

Stored where you choose
Panels are labeled and stacked on site, usually in the garage or on the driveway under cover, so nothing leaves your property.

The roof goes on
Full tear-off, decking check, new underlayment, and new flashed mounts set in the right places for the array to go back on.

Reinstalled and reconnected
The array goes back on the new mounts, gets reconnected, and is tested before the electrician leaves. Typically within a week of the roof.

A licensed electrical partner
We roof. Licensed electricians handle the panels and the inverter connections. That's the right way and the way your installer's warranty expects.

If it's an insurance job
Detach and reset is a normal line item on a hail claim. We document the array with the roof so it's in the scope from the start.

Why we don't roof around the panels
Every solar mount is a hole through the roof. Leaving the array in place means the old shingles and old flashing stay under it, and that is exactly where the next leak starts. Taking the panels off lets us tear off to the deck, run new underlayment, set new flashed mounts, and reinstall the array on a roof that will outlast it. Rooftop solar is common along the Wasatch Front, so this is a job we plan for, not a surprise.
- Panels labeled, removed and stored on site by licensed electricians
- Full tear-off and new flashed mounts, not a roof-over
- Reinstall and reconnect, tested before the electrician leaves
- One quote for the roof and the detach and reset together
Need the detach and reset on its own, or quoted separately from the roof? Ask. We'll price it as its own line item. Have the panels' paperwork handy when we come out and we'll check the mounting specs and any installer warranty conditions before anything comes off.
Solar detach and reset FAQ
Can't you just roof around the panels?
We won't. The old shingles and flashing under the array are exactly where the next leak starts. The panels come off, the roof gets done right, and they go back on new mounts.
How long are my panels off?
Usually a day before the roof and up to about a week after, depending on the electrician's schedule. Your system is off during that window.
Who removes the panels?
A licensed electrical contractor, not our roofing crew. That's the right way and the way your solar installer's warranty expects.
Does insurance cover detach and reset after hail?
It's a normal line item on a hail claim. We document the array with the roof so it's in the scope from the start; your policy is the final word.
How claims work →Will this affect my solar warranty?
It shouldn't if licensed electricians do the work and the mounts are set to the manufacturer's spec. Bring your installer's paperwork to the estimate and we'll check the conditions before anything comes off.
Do you install solar?
No. We roof. If you want a new array after the roof, we can set the new roof up so an installer has a clean deck to work with.
Get a quote for the roof and the panels together
Tell us you have solar and we'll bring the electrical partner into the estimate from the start. Free inspection, photos of everything, and one written quote that covers the whole job.
Request your estimate
We use your details only to set up your inspection. Privacy policy
