★★★★ 4.7/5 from 44+ Google reviews
Davis County & the Wasatch Front

Roof replacement done in a day

A full tear-off and a new roof for Davis County and Wasatch Front homes. Decking checked before anything covers it, installed to code, and most homes finished in a single day.

Free inspection & written estimate
Insurance or out-of-pocket, both handled
Most roofs done in one day

Free replacement estimate

No obligation, no pressure. Tell us about your roof.

UTLicensed contractor4.7★44+ Google reviews
Insured
FreeRoof inspectionsFarmingtonDavis County based
Repair or replace?

Signs your roof is done, not just damaged

Plenty of roofs just need a repair, and we'll tell you when that's the case. These are the signs we look for on roofs in Layton, Ogden and across the Wasatch Front before we call a roof done.

Sun-baked shingles curled and crumbling across a whole roof slope

Curling across whole slopes

One curled shingle is a repair. A whole south-facing slope curling at the edges means the asphalt has dried out, and no repair brings it back.

Bald patches across an old shingle roof where the granules have worn away

Widespread granule loss

Bald patches that show the black mat underneath. Once the granules are gone, the sun finishes the job in a few seasons.

Worn-out shingle roof on a 1990s two-story home, tabs missing and faded

It's 20 years old

Davis County subdivisions built in the late 90s and 2000s are hitting the end of their first roof right now. Age alone isn't a verdict, but it's a reason to look.

Ceiling with repeat water-stain rings and patched drywall from recurring roof leaks

Leaks keep coming back

When a repair fixes one leak and another shows up next spring, the roof is telling you something. Chasing leaks on a tired roof costs more than replacing it.

Eave edge showing three layers of old shingles stacked above the fascia

Three layers already

Some older homes have been roofed over twice. Code limits the layers, and a third one hides rot you can't see. That roof comes off to the deck.

Hail-damaged shingles on an older roof after a Wasatch Front storm

A storm finished it off

Hail on a roof with years left is a claim for a repair or a replacement. Hail on a roof that was already tired usually settles the question.

Not sure which side of the line your roof is on? That's exactly what the free inspection answers, and if a repair will genuinely hold, we'll recommend the repair.

Synthetic underlayment and new architectural shingles going down during a Denali roof replacement
No cost, no obligation

An estimate built on your actual roof

We don't quote roofs from satellite photos. We get up there, measure it, check the decking and ventilation, and photograph what we find, then walk you through your options in plain language. Have solar panels? We coordinate the detach and reset on the same schedule as the roof.

  • On-the-roof measurement, no satellite guesswork
  • Decking, flashing & ventilation checked, not just shingles
  • Material and color options that fit your house and your HOA
  • A written, itemized estimate, yours to keep and compare

Take the estimate and shop it around; we're comfortable being compared. And if the honest answer is that your roof has years left, that's what we'll tell you.

Start to finish

How a replacement works

A new roof is a big decision, but it shouldn't be a confusing one. Here's the whole process, and for most homes, steps four through six happen in a single day.

01

Free inspection & written estimate

We measure the roof, check the decking, and hand you an itemized written estimate. Insurance involved? We handle that side too.

02

Pick your material & color

We bring samples, talk through how each shingle holds up in Wasatch Front sun and snow, and let you decide without a hard sell.

03

Permit, scheduling & prep

We pull the permit with your city, schedule around your life and the weather, order materials, and tell you exactly what to expect on build day.

04

Tear-off & decking check

Morning of: we protect landscaping and siding, tear off the old roof down to the deck, and inspect every sheet of decking, replacing anything soft before it gets covered up.

05

New roof, installed to code

Ice-and-water shield, synthetic underlayment, drip edge, flashing, ventilation, and your new roof, installed to manufacturer spec and the local code.

06

Cleanup & final walkthrough

Magnetic rollers across the yard and driveway for stray nails, every scrap hauled off, and a walkthrough with you before we call it done.

Build day

What "done in a day" actually looks like

The crew shows up at first light. By mid-morning the old roof is off and the decking is checked. By afternoon the new roof is going down, and by evening we're running magnets through your grass. You leave for work in the morning and come home to a new roof.

One day matters for more than convenience: your roof deck is not left exposed overnight, there's no week of a torn-up house, and the disruption to your family is about a day. Larger or steeper roofs can run two, and we'll tell you which yours is before we start.

Replacing after hail? Here's how a Utah storm claim runs. Wondering what to look for in a roofer? Hold us to this list.

Reviews

Roof replacement reviews

4.7
★★★★
44+ Google reviews from Wasatch Front homeowners
Read all our reviews on Google →

"Working with Danali roofing has been a great experience. They gave a very competitive quote, and the products are great quality. Edgar explained the process, and was super at communicating throughout the entire reroof. His team was quick and efficient, and the yard was left clean when they were finished."

Merrill J.
Google review

"Denali roofing just finished giving me a new roof that they completed in one day start to finish. They found more damage after they got started with three layers of shingles and leaks in the roof causing damage to the wood underneath. The roof was seventy years old. We discussed our options and Jaun gave us a good deal that I was very happy with. They were the nicest people and I would whole heartily recommend them to everyone. They will be doing my gutters in the near future. Thanks Denali for a wonderful experience."

Scott J.
Google review
Questions

Davis County roof replacement FAQ

How long does a roof replacement take?

Most residential roofs are torn off, replaced, and cleaned up in one day. Larger, steeper, or multi-layer roofs can run two. We tell you which before we start.

Do I need a permit to replace my roof in Davis County?

Most cities in Davis County require a permit for a re-roof, and we pull it. A contractor who skips the permit is skipping the inspection too.

What if you find bad decking?

We replace it, photograph it, and show you before it's covered. Decking replacement is quoted per sheet up front so there's no surprise on build day.

Can you replace a roof in winter?

Yes, on the right days. Shingles seal best above freezing, so we watch the forecast and schedule around it. Winter installs are common on the Wasatch Front.

Do you handle the insurance side?

We document the damage, write the scope, and meet your adjuster. Your policy and your deductible are between you and your carrier.

How claims work →
What's included in the estimate?

Tear-off, decking check, ice-and-water shield, underlayment, drip edge, flashing, ventilation, shingles, ridge cap, cleanup, and haul-off. Itemized, in writing, in plain language.

Get your free replacement estimate

We'll get on the roof, measure it, check the decking, and hand you a written estimate. No pressure, no obligation. If a repair will hold instead, we'll tell you that.

📞 (385) 329-1509📍 240 N E Promontory Ste 200, Farmington, UT 84025🕗 Open 24/7

Request your estimate

📞 Call (385) 329-1509Free Estimate